San Jome received another interim reading of 15kl payable on 15 March 2023. On the account payable on 15 February 2023 the municipality corrected the previous interim accounts, which were done for months by the Municipality. The corrected reading taken on 5 December 2022 was 319. On 1 March 2023 the attached photo was taken of the San Jome Body Corporate's meter which show a reading of 325. Therefore 6 kl from 6 December 2022 to 1 March 2023 average of 2 kl per month while we are billed for 15 kl in 1 month. This has a big impact on the Body Corporate's if we are getting these interim billed accounts. It would be appreciated if the municipality can ensure that the installed smart meter is in a working condition to allow the Body Corporate could get a correct account for actual water used. Thanks